- Historical developments in the oil industry
- Historical developments in the gas industry
- O&G reserves, production and consumption
- Geopolitics and global factors
- International companies and references
- The concept of commodities
- Value chain
- Oil value chain
- Gas value chain
- Vertical integration and transfer pricing
- Upstream
- Exploration, drilling and production techniques
- Midstream
- Downstream
- Safety, risk and environment
- O&G traffics
- Chartering arrangements
- Chartering policies
- Other chartering alternatives
- Documentation
- Crude oil (I)
- Crude oil (II)
- Crude oil (III)
- Refining processes (I)
- Refining processes (II)
- Refining schemes (I)
- Refining schemes (II)
- Refining products (I)
- Refining products (II)
- Margin and profitability
- Bioenergy
- Biofuels
- Bioethanol & biodiesel
- SAF & biogas
- Bio-refineries
- HSE & CO2 emissions
- Oil industry. Short and medium-term scenario
- Crude oil markets
- Refining product markets
- Biofuels markets
- Composition and properties
- Exploration and production techniques
- Deposit types and characterisation
- Extraction techniques
- Fracking
- Natural gas value chain
- Gas processing
- Liquefaction
- Transport of liquefied natural gas
- Regasification
- Storage of liquefied natural gas
- Offshore installations
- Gas system and distribution
- Marketing, regulation and markets
- HSE and natural and liquefied natural gas applications
- Energy transition and global position
- European Green Deal & LATAM Green
- Net zero emissions by 2050
- Natural gas central to the energy transition
- Circular economy. Natural gas and hydrogen
- Introduction. Fundamentals of the petrochemical industry
- Main petrochemical chains
- Plastics
- Global petrochemical scenario
- Petrochemical companies
- Methane chain (I). Methanol
- Methane chain (II). Ammonia
- Ethylene chain (I)
- Ethylene chain (II)
- Petrochemical market. Methane and ethylene chains
- Propylene chain (I)
- Propylene (II) chain
- C4 and C5 fraction chains (I)
- C4 and C5 fraction chains (II)
- Petrochemicals market. Propylene chains and C4 and C5 chains
- Aromatic chains
- Benzene chain
- Toluene chain
- Xylene chain
- Market for aromatics chains
- Participants and their market position
- Energy markets
- The market in times of pandemic by COVID-19
- Pricing
- Pricing formulas
- The oil refining business
- Current situation and expectations of the industry
- Procurement plan for a refinery system
- Contracts for the sale and purchase of petroleum
- Gas sales contracts
- Derivative instruments
- Futures markets
- Options contracts
- Swaps
- Price coverage
- Organisation of a Trading Department
- Evolution of trading practices
- Risk Management
- Price forecasting techniques
- Fundamental concepts of chartist and technical analysis
- What is a project?
- Project definition and scope
- Phases of project engineering
- Basic diagrams in a project
- Construction and commissioning
- Layout. General and equipment
- Distribution of equipment in the plant. On Site layout
- Environment and safety in chemical plant design
- Fluid properties: density and viscosity
- Mechanical properties and materials testing
- Types of materials. Structure of materials
- Iron base metals
- Ceramic materials and polymers
- Non-ferrous alloys
- Composite materials
- How to specify a pipeline
- Valves
- Pipe joints
- Pipe supports. Insulation and pipe support
- Basic piping design
- Basic design of buffer tanks
- Basic design of separator tanks
- Storage tanks
- Reactors
- Distillation columns
- Heat transfer. Introduction
- Heat exchangers THEME (I)
- Heat exchangers THEME (II)
- Cooling towers
- Process furnaces
- Centrifugal pumps
- Positive displacement pumps
- Compressors. Introduction
- Centrifugal compressors
- Alternative compressors
- Ejectors
- Pneumatic transport
- Mixers and stirrers
- Sealing of dynamic equipment. Packings and mechanical seals
- Industrial lubrication
- What is a project
- Types of projects
- EPC projects (Engineering, Procurement, Construction)
- EPC projects in complex sectors
- Life cycle of a project
- Project management
- Main actors in a turnkey project
- Organisation of a project
- The project management team: the project manager (I)
- The project management team: the project manager (II)
- The project management team: project operations manager, project manager and area manager
- The project management team: project engineers, material manager and interface manager.
- The project management team: engineering manager and project assistants
- Conclusions and practical example of an organisational chart
- Business management
- Contract manager, administration manager and project control manager
- Risk manager
- Procurement management
- Quality control, quality assurance management and HSE
- Construction management
- What is a contract?
- Terminology in contracts
- Concept of contract management
- International arbitration
- International standard construction contracts
- What is the law?
- The evidence
- Grounds for invalidity of a contract
- Termination of a contract under English law
- Professional responsibility
- Building Law Society
- Guidance part A: Concepts of delay, disruption and acceleration
- Guidance part B: guide to key principles (I)
- Guidance part B: guide to key principles (II)
- Guidance part B: Guidance on key principles (III)
- Guidance Part B: Guidance on key principles (IV)
- Instruction to Smart Contracts
- Most common uses of Smart Contracts (I)
- Most common uses of Smart Contracts (II)
- The great paradox of Smart Contracts



